Bathroom Reno: Day 3

Day 3 Things are continuing to move along at a cracking pace!  Today saw more framing on the walls - you wouldn’t believe how creative they’ve had to be to overcome the lack of right angles!  Some of the struts are really wide at the bottom of the wall but hardly anything at the top!

And the house is in shock: there’s insulation in the walls and ceiling of this room now.  Unheard of in the history of this house, I’m sure.

However there’s one thing I’m not too sure of.  It appears they have installed a water torture basin.  I didn’t want one of those!  I’ve been assured it’s for gold fish, however the water outlet at the bottom makes me think someone’s trying to pull my eyebrows over my eyes (yes, they could do with a trim. . .).

 

 

2 comments for “Bathroom Reno: Day 3

  1. 1 February 2007 at 5:41 pm

    I assume you are using autostitch to get the final image together of the smallest room in the house – hard to take shots of bathrooms isn’t it! How many photos are in the final stitch?

    Should be very exciting for the Snuva clan when it’s all finished!

  2. Snuva
    1 February 2007 at 6:01 pm

    Yes, I Autostitch around 25 photos. And it is hard to photograph – but our smallest room in the house is the toilet off our laundry / under the stairs. And it is loving this work being done on the bathroom – It’s never felt so loved!

    It will be VERY exciting when all is done!!!

Comments are closed.