Bathroom Reno: Day 2

Woo-hoo!  Day two!  Well, today they did all sorts of things, mostly getting things in so they can be behind the plaster.  An electrician got wiring in, a plumber plumbed (I assume for a never-emptying water dish for me?), holes were put in for the extractor fan (to extract to the outside, not just into a ceiling space), a wall was framed, etc. 

They must really love me – Stuart arrived before 8 am! 

Some of the tools they use would be pretty scary if I wasn’t such a brave dog.  I had to hold HandsomeMan’s paw so he could go into the back garden while they were using a circular saw – no, really, it was him and not me that made drips on the carpet when he was scared!

 

Â